11 October 2007

Pouring rain and concrete

The roof over the 1st floor was poured during a very rainy Tuesday. We praise God that he kept all the workers safe throughout the day. The bamboo stairs seemed dangerously slippery as the workers carried bowls of concrete the two stories up to the top. One worker slipped at the bottom of the stairs and hurt her back. It was only because we kept her from doing so, that she didn’t go back to work. She didn’t want to leave her colleagues who were still working in the rain.

No comments:

Post a Comment

LAMB English Medium School - Bangladesh